Tenders & Contracts
Find contracts your business can bid for and see what buyers need.
4,026 links
-
CA16567 - R5996B - LIFT 14 - Queen Mary's Childrens Hospital - SHGH
Description
QMCH lift modernisation intends to facilitate the replacement of the doors and motor.
To access this competition:
Registered:
Login to https://suppliers.multiquote.com and view the opportunity CA16567.
Not registered:
Visit https://suppliers.multiquote.com then register and quote CA16567 as the reason for registration.
Any queries please contact MultiQuote on 0151 482 9230.
-
EKFB NC2A - Transport and installation of precast tunnel segments
Description
The Wendover Green Tunnel consists of five pre-cast concrete segments but is intersected by two bridges negating the ability to place the tunnel sections by traditional crane.
An alternative solution anticipated using an SPMT (Self-Propelled Modular Transporter).
Product weights are dividing wall 43.6tonne, arch wall 37.5 tonne, arch roof 19tonne. The arch roof sections are lifted to approx. 12m high.
The tunnel segments have been procured and are delivered to site on trailers.
-
Operation and Maintenance Manuals (O & M)
Description
Mace Dragados require a specialist O & M specialist to provide the following scope of work.
Provision of Operations & Maintenance manual compilation service and technical authoring for HS2 Euston Station project. Note we may subsequently utilise any agreed contract for the our HS2 Curzon Street project in Birmingham
The intention is to appoint a technical author to support the project operating on a package by package call - off basis.
Provide services to compile of each package's component of the operations & maintenance manual to form a coherent body of information overall.
Review content provided by each individual subcontractor and ensure consistent quality of input to the manual.t
Provide regular updates in terms of progress towards completion and where subcontractor information is inadequate.
-
School Transport - SEND - Spilsby Woodlands / Eresby - Taxi - BPB000138
Description
SEND Taxi contracts in Lincolnshire
-
School Transport - SEND - Gainsborough Warren Wood - Taxi - BPB000148
Description
SEND taxi contracts in Lincolnshire
-
GB-Barnet: Provision of Council Vehicle Fleet Washing Services *Duplicated*
Description
Provision of vehicle washing services. This covers the washing of the Council fleet vehicles, predominantly used for front line services, such as Waste & Recycling. The estimated value of the contract is up to £200,000 for a period of 12+12 months.
To respond to this opportunity, please follow this link: https://www.delta-esourcing.com/respond/E6K5P2QFH3
-
CA16569 - RFQ 2025/29 - Comprehensive Services Contract for the Evaluation, Risk Assessment, and Post-Inspection Reporting of Newry Mourne and Down District Play Areas
Description
Newry, Mourne and Down District Council (The Council) seeks to appoint a suitably qualified and independent inspector to carry out annual risk assessments, post-inspection reporting, and comprehensive play area audit reporting for all sites. This process is essential to ensuring the highest standards of safety, compliance with legal obligations, and the continued enhancement of recreational spaces for residents and visitors.
To access this competition:
Registered:
Login to https://suppliers.multiquote.com and view the opportunity CA16569.
Not registered:
Visit https://suppliers.multiquote.com then register and quote CA16569 as the reason for registration.
Any queries please contact MultiQuote on 0151 482 9230.
-
BPB-000135 - School - South - South Holland/South Kesteven - Taxi and PSV
Description
Education contracts in Lincolnshire
-
Digital Learning Review of the Blackboard system
Description
https://in-tendhost.co.uk/universityforthecreativearts/aspx/ProjectManage/126
UCA is committed to enhancing its digital learning, we are seeking a supplier to evaluate our use of Blackboard Ultra.
We are seeking a supplier who has significant experience with Blackboard Ultra to lead strategic review of the university's digital learning environment. This includes auditing module sites, engaging stakeholders, and delivering actionable recommendations to support future online postgraduate and CPD offerings. The work will span four key phases: scoping, site analysis, stakeholder engagement, and final reporting.
Suppliers must have:
Proven experience with Blackboard Ultra within a higher education setting
Strong understanding of digital learning, especially in creative disciplines
Excellent stakeholder engagement and qualitative research skills
Ability to deliver clear, strategic documentation and recommendations
Familiarity with online postgraduate and CPD programme design
The opportunity can be found at https://in-tendhost.co.uk/universityforthecreativearts/aspx/ProjectManage/126 where returns can be submitted, alternatively returns can be sent to Procurement <[email protected]>
-
Pest Control - bird netting
Description
supply and fix bird netting to the roof of an ambulance station pp North East Ambulance service
this opportunity will be awarded on PRICE submitted in conjunction with the recommended specification, NEAS reserve the right to accept the tender which is most suitable in both price and offered spec, this will not necessarily be the lowest price but the price and solution considered best fit
detailed spec may be found by suppliers registered with procontract, to register see link below:
https://procontract.due-north.com/
https://procontract.due-north.com/register
-
Balfour Beatty - Roads North of the Thames-LTC - Drainage Survey Works
Description
We are inviting expressions of interest from qualified and experienced sub-contractors for the delivery of our Drainage Survey Works Package as part of an upcoming infrastructure project.
This package will include:
Topographical surveys
Manhole cover lift inspections
Closed-Circuit Television (CCTV) drainage surveys
The Contractor must comply with the technical requirements outlined in the project specification, including:
Pre-cleansing of existing drainage systems prior to CCTV inspection, in accordance with MCHW Clause 509.
Accurate data capture and reporting aligned with relevant industry standards and best practices.
On-site refinement and confirmation of survey extents based on a high-level desktop study and supporting appendices.
Interested sub-contractors must demonstrate:
Proven experience in delivering similar drainage survey works.
Competence in using WRC-compliant CCTV equipment and coding.
Robust health, safety, and environmental management systems.
Appropriate certifications (e.g. ISO 9001, ISO 14001, ISO 45001) and familiarity with the Specification for Highway Works Series 500.
To express your interest and receive further details-including pre-qualification requirements and tender timelines-please respond to this notice by 15.10.25.
-
-
Systematic Literature Review of Assurance Measures Supporting High Impact Regulatory Decisions
Description
The proposed research aims to explore the evidence of effectiveness of the type of assurance measures that are being put in place and developed by us to mitigate bias for our high impact regulatory decisions, including how these can most effectively be combined, deployed and adhered to.
-
RFP - The Supply of: IPS/SEQF and Health and Community Integration Services under Connect to Work in Buckinghamshire
Description
Connect to Work aims to address 'Hidden Unemployment' through a collaborative, locally driven approach, helping local communities to unlock their potential and contribute to both local and national growth. Quality employment is known to positively impact physical and mental health, providing income, social interaction, and a sense of purpose.
Fedcap will seek to submit tenders and are looking for potential delivery partners to be named in our submissions.
Our approach is to embrace local capacity to deliver IPS and/or SEQF services to eligible residents and we seek partners who can bring:
1. Understanding and experience of supported employment delivery models including Individual Placement and Support (IPS) and/or Supported Employment Quality Framework (SEQF)
2. Local knowledge, insight and relationships, evidenced through integrated delivery/partnership with health services, social care and community/faith-based organisations
Interested organisations should complete the attached Request for Proposal (RFP) regarding working with us on this opportunity. Please note that it will be likely that we will partner with different organisations in the county areas, reflecting the unique and differing needs of people living in Buckinghamshire.
-
CA16571 - Estates Review Tender
Description
To examine Estates at Leicester College and provide recs
To access this competition:
Registered:
Login to https://suppliers.multiquote.com and view the opportunity CA16571.
Not registered:
Visit https://suppliers.multiquote.com then register and quote CA16571 as the reason for registration.
Any queries please contact MultiQuote on 0151 482 9230.
-
Breastfeeding Peer Support Service - Birmingham City Council - Soft Market Testing
Description
Birmingham City Council Public Health are intending to commission a Breastfeeding Peer Support Service and we would like to understand the market availability and interest in providing this service.
This service will provide culturally sensitive support for parents to initiate and continue breastfeeding and aims to promote maternal and infant health, emotional wellbeing and responsive feeding, while respecting informed choices not to breastfeed and ensuring safe formula feeding support.
Our intention is that the service will be available 7 days a week, city-wide and will be delivered by trained peer supporters, including local parents with breastfeeding experience. It will offer antenatal education and postnatal support delivered in community venues and parents homes, as well as a support helpline.
The Provider will work in partnership with maternity units, Family Hubs and health professionals. In 2024, there were 15,561 live births in Birmingham.
NOTE: All information provided will be treated confidentially and securely. Information will not be shared outside of the commissioning teams. For clarity, this is a Soft Market Testing exercise to gather information and is not an invitation to provide a quotation.
If you are interested in this soft market testing please click on the link below to complete the questionnaire by 10am on 15th October 2025.
https://forms.office.com/Pages/ResponsePage.aspx?id=Z86aaeTSzUuzA9K74rm78bYehJsJPj9JkvtJ9lADkcVUMjJENzVDRzczUUE4R1FUR00zQ0ZFOTdWTi4u
-
BRET - Biometric Remote Enrolment Trial
Description
The Home Office will be holding market engagement sessions to discuss future plans for trialling remote biometric enrolment technology. These trials will focus on capture of fingerprints and remote identity binding via smartphone application(s). Suppliers with suitable apps are invited to attend this event. The event will be hosted in 2 Marsham Street or via MS Teams on Monday 13 October 14:30 to 17:30 and Friday 17 October 9:30 to 12:30. Please email [email protected] if you are interested in attending.
-
Provision of Material Collection Services (MCS) for West London Waste Authority
Description
West London Waste Authority (WLWA) is a statutory Waste Disposal Authority (WDA) formed in 1986. WLWA is responsible for disposing of waste collected by the London Boroughs of Brent, Ealing, Harrow, Hillingdon, Hounslow and Richmond upon Thames. About 1.7 million people live in this area, which covers 38,000 hectares.
Since 2020, WLWA has provided residents with digital on-demand access to a cross-borough, home collection service called the Material Collection Service (MCS) in collaboration with four Boroughs - Brent, Ealing, Harrow and Hounslow.
This service focuses primarily on collecting unwanted and broken large bulky items or materials that residents no longer have use for. As part of WLWA's focus to keep 'treating waste as a valuable resource' the MCS helps us collect these unwanted items and seek to divert them for use in a more circular way - a way where we can recirculate materials to keep them in use for longer through reuse, repair, reprocessing and recycle and design out waste from our system.
The focus of this contract is to provide a high-quality online on-demand collection service, delivered in a flexible and responsive manner, in line with WLWA's vision, mission and purpose. To satisfy WLWA's and its constituent boroughs on-going and varying waste transport services and associated needs, the appointed Contractor must be able to provide services in line with any changes to statutory, operational or customer service requirements throughout the life of the contract.
The aim of this market engagement is to determine whether there are suppliers in the market that are able to deliver the required collection services for multiple materials to WLWA and its constituent boroughs.
A general specification about the service is attached.
If you are interested in the opportunity, please contact [email protected] by no later than 12:00 pm on Friday 31st October 2025.
*** Please note that this is neither a call for competition nor a procurement exercise ***
*** This future procurement will be run through WLWA's Dynamic Purchasing System (DPS) therefore, will be procured under the Public Contract Regulations 2015 (as amended). Once, interested parties have contacted WLWA, they will be invited to the join the DPS on Proactis.***
***Please allow up to 10 working days for registration to the DPS to be completed***
-
BBV HS2 MWCC North - GRP Access
Description
The contractor is seeking a Supplier to undertake the detailed design based on the drawings provided by the designer, manufacture, storage (if necessary) and transport to the different locations Routewide of the access staircase that will be used to access the different embankments and structures along the Sublots. The subcontractor is to provide all necessary permanent design information, materials and equipment to construct the staircases across the project.
This advert is to engage the market for a potential of 1 of 3 avenues;
1) Glass Reinforced Plastic (GRP)
2) Precast
3) Cast-in-situ
-
Brewery Turnback - ES6-8 Civil Engineering
Description
Brewery Turnback an enhancement scheme funded by the DfT. Formerly known as Manchester Victoria East Turnback, it has been prioritised for early development from the Central Manchester Capacity and Performance study to boost capacity and resilience. The scheme is for the design and delivery of a West facing turnback, located at Brewery Junction.
At Victoria station, the through platforms also accommodate terminating trains due to an imbalance of local services to the east and west of the station. The extended time to terminate and turnback in the platforms restricts platform availability for through services. Operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during times of perturbation.
The turnback is to accommodate trains up to 6 car x 26 m vehicles (DMU and EMU); with trains being able to access the turnback to and from Platforms 3-6 at Manchester Victoria station.
As part of the MNTP programme, it was identified that the provision of a turnback facility to the East of Manchester Victoria Train station would provide operational flexibility. Currently, the platforms at Manchester Victoria must accommodate terminating trains, this restricts the availability of the through platforms, impacting performance and causing a timetable constraint. In a standard hour, two services, typically from Kirkby / Preston / Wigan are booked to terminate in the through platforms before the driver changes ends and the train departs in the opposite direction. Typical turnaround times are between 5-10 minutes, meaning that the platform, and route through it, remains occupied for the duration of the turnaround.
The operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during perturbation.
ES2-4 design and development was undertaken by WSP Limited and accepted by Network Rail. However, there are many instances within the designs where assumptions have been made stating that the TRU works would be complete prior to commencement of the project and all as built designs and source records would be available.
Ancillary Civil Engineering Scope of Work:
The supply and installation of the new infrastructure. This includes, but is not limited to, the following: new cable trough route, new signal foundations, new LOC foundations, ARMCO barriers, fencing, ducting system, and URX system. This includes all handback deliverables, such as redline drawings, O&M manuals, and attendance at AMP016 walkouts.
-
Brewery Turnback - ES6-8 Devegetation Works
Description
Brewery Turnback an enhancement scheme funded by the DfT. Formerly known as Manchester Victoria East Turnback, it has been prioritised for early development from the Central Manchester Capacity and Performance study to boost capacity and resilience. The scheme is for the design and delivery of a West facing turnback, located at Brewery Junction.
At Victoria station, the through platforms also accommodate terminating trains due to an imbalance of local services to the east and west of the station. The extended time to terminate and turnback in the platforms restricts platform availability for through services. Operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during times of perturbation.
The turnback is to accommodate trains up to 6 car x 26 m vehicles (DMU and EMU); with trains being able to access the turnback to and from Platforms 3-6 at Manchester Victoria station.
As part of the MNTP programme, it was identified that the provision of a turnback facility to the East of Manchester Victoria Train station would provide operational flexibility. Currently, the platforms at Manchester Victoria must accommodate terminating trains, this restricts the availability of the through platforms, impacting performance and causing a timetable constraint. In a standard hour, two services, typically from Kirkby / Preston / Wigan are booked to terminate in the through platforms before the driver changes ends and the train departs in the opposite direction. Typical turnaround times are between 5-10 minutes, meaning that the platform, and route through it, remains occupied for the duration of the turnaround.
The operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during perturbation.
ES2-4 design and development was undertaken by WSP Limited and accepted by Network Rail. However, there are many instances within the designs where assumptions have been made stating that the TRU works would be complete prior to commencement of the project and all as built designs and source records would be available.
Devegetation Scope of Work:
- remove the existing vegetation from the proposed footprint of construction work, including removal of invasive species - JKW.
-
Brewery Turnback - ES6-8 E & P Works
Description
Brewery Turnback an enhancement scheme funded by the DfT. Formerly known as Manchester Victoria East Turnback, it has been prioritised for early development from the Central Manchester Capacity and Performance study to boost capacity and resilience. The scheme is for the design and delivery of a West facing turnback, located at Brewery Junction.
At Victoria station, the through platforms also accommodate terminating trains due to an imbalance of local services to the east and west of the station. The extended time to terminate and turnback in the platforms restricts platform availability for through services. Operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during times of perturbation.
The turnback is to accommodate trains up to 6 car x 26 m vehicles (DMU and EMU); with trains being able to access the turnback to and from Platforms 3-6 at Manchester Victoria station.
As part of the MNTP programme, it was identified that the provision of a turnback facility to the East of Manchester Victoria Train station would provide operational flexibility. Currently, the platforms at Manchester Victoria must accommodate terminating trains, this restricts the availability of the through platforms, impacting performance and causing a timetable constraint. In a standard hour, two services, typically from Kirkby / Preston / Wigan are booked to terminate in the through platforms before the driver changes ends and the train departs in the opposite direction. Typical turnaround times are between 5-10 minutes, meaning that the platform, and route through it, remains occupied for the duration of the turnaround.
The operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during perturbation.
ES2-4 design and development was undertaken by WSP Limited and accepted by Network Rail. However, there are many instances within the designs where assumptions have been made stating that the TRU works would be complete prior to commencement of the project and all as built designs and source records would be available.
E&P Scope of Work:
The supply, installation, testing and commissioning of the point heating system. This includes, but is not limited to: Mains Distribution equipment, 230v and 110v LV cabling, Heater strips, Heat retainers, Clamp lock heaters, TCBs', PHT's and associated controls.
-
Brewery Turnback - ES6-8 M & E works
Description
Brewery Turnback an enhancement scheme funded by the DfT. Formerly known as Manchester Victoria East Turnback, it has been prioritised for early development from the Central Manchester Capacity and Performance study to boost capacity and resilience. The scheme is for the design and delivery of a West facing turnback, located at Brewery Junction.
At Victoria station, the through platforms also accommodate terminating trains due to an imbalance of local services to the east and west of the station. The extended time to terminate and turnback in the platforms restricts platform availability for through services. Operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during times of perturbation.
The turnback is to accommodate trains up to 6 car x 26 m vehicles (DMU and EMU); with trains being able to access the turnback to and from Platforms 3-6 at Manchester Victoria station.
As part of the MNTP programme, it was identified that the provision of a turnback facility to the East of Manchester Victoria Train station would provide operational flexibility. Currently, the platforms at Manchester Victoria must accommodate terminating trains, this restricts the availability of the through platforms, impacting performance and causing a timetable constraint. In a standard hour, two services, typically from Kirkby / Preston / Wigan are booked to terminate in the through platforms before the driver changes ends and the train departs in the opposite direction. Typical turnaround times are between 5-10 minutes, meaning that the platform, and route through it, remains occupied for the duration of the turnaround.
The operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during perturbation.
ES2-4 design and development was undertaken by WSP Limited and accepted by Network Rail. However, there are many instances within the designs where assumptions have been made stating that the TRU works would be complete prior to commencement of the project and all as built designs and source records would be available.
M & E Scope of Work:
The supply, installation, testing and commissioning of the Small power and Lighting systems. This includes, but is not limited to: DNO Cubicle, Mains Distribution equipment, 400v and 230v cabling, Bollard Lighting, Buffer stop Lighting and associated controls. This is to include all hand back deliverables such as red line drawings, O&M manuals, eclipse updates and attendance at AMP016 walkouts.
-
Brewery Turnback - ES6-8 OLE Civilis / Foundations Works
Description
Brewery Turnback an enhancement scheme funded by the DfT. Formerly known as Manchester Victoria East Turnback, it has been prioritised for early development from the Central Manchester Capacity and Performance study to boost capacity and resilience. The scheme is for the design and delivery of a West facing turnback, located at Brewery Junction.
At Victoria station, the through platforms also accommodate terminating trains due to an imbalance of local services to the east and west of the station. The extended time to terminate and turnback in the platforms restricts platform availability for through services. Operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during times of perturbation.
The turnback is to accommodate trains up to 6 car x 26 m vehicles (DMU and EMU); with trains being able to access the turnback to and from Platforms 3-6 at Manchester Victoria station.
As part of the MNTP programme, it was identified that the provision of a turnback facility to the East of Manchester Victoria Train station would provide operational flexibility. Currently, the platforms at Manchester Victoria must accommodate terminating trains, this restricts the availability of the through platforms, impacting performance and causing a timetable constraint. In a standard hour, two services, typically from Kirkby / Preston / Wigan are booked to terminate in the through platforms before the driver changes ends and the train departs in the opposite direction. Typical turnaround times are between 5-10 minutes, meaning that the platform, and route through it, remains occupied for the duration of the turnaround.
The operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during perturbation.
ES2-4 design and development was undertaken by WSP Limited and accepted by Network Rail. However, there are many instances within the designs where assumptions have been made stating that the TRU works would be complete prior to commencement of the project and all as built designs and source records would be available.
OLE Scope of Work:
The supply and installation and commissioning of new OLE foundations on the UP/ Down Rochdale Fast and on the new Turnback between Dalton Street and Miles Platting Junction (combination of piled, concrete pad, wall-mounted)
This includes all hand back deliverables, such as redline drawings and attendance at AMP016 walkouts.
-
Brewery Turnback - ES6-8 OLE Infrastructure
Description
Brewery Turnback an enhancement scheme funded by the DfT. Formerly known as Manchester Victoria East Turnback, it has been prioritised for early development from the Central Manchester Capacity and Performance study to boost capacity and resilience. The scheme is for the design and delivery of a West facing turnback, located at Brewery Junction.
At Victoria station, the through platforms also accommodate terminating trains due to an imbalance of local services to the east and west of the station. The extended time to terminate and turnback in the platforms restricts platform availability for through services. Operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during times of perturbation.
The turnback is to accommodate trains up to 6 car x 26 m vehicles (DMU and EMU); with trains being able to access the turnback to and from Platforms 3-6 at Manchester Victoria station.
As part of the MNTP programme, it was identified that the provision of a turnback facility to the East of Manchester Victoria Train station would provide operational flexibility. Currently, the platforms at Manchester Victoria must accommodate terminating trains, this restricts the availability of the through platforms, impacting performance and causing a timetable constraint. In a standard hour, two services, typically from Kirkby / Preston / Wigan are booked to terminate in the through platforms before the driver changes ends and the train departs in the opposite direction. Typical turnaround times are between 5-10 minutes, meaning that the platform, and route through it, remains occupied for the duration of the turnaround.
The operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during perturbation.
ES2-4 design and development was undertaken by WSP Limited and accepted by Network Rail. However, there are many instances within the designs where assumptions have been made stating that the TRU works would be complete prior to commencement of the project and all as built designs and source records would be available.
OLE Infrastructure Scope of Work:
The supply, installation, testing, and commissioning of new OLE infrastructure on the UP/Down Rochdale Fast and the new Turnback between Dalton Street and Miles Platting Junction (a combination of STC, TTC, and portals).
New wiring on the UP/ Down Rochdale Fast and a new Turnback between Manchester Victoria and Miles Platting Junction. All associated OLE works to support the new infrastructure.
This includes all hand back deliverables, such as redline drawings, O&M manuals, and attendance at AMP016 walkouts.