Skip to content

Description

United Kingdom National Nuclear Laboratory (UKNNL) intends on establishing a DPS route to market for the Operations, Site Work and Facilities Management requirement, across 8 Lots.
Site Preparation
Building and Facility Construction and Maintenance Services
Industrial Production and Manufacturing Services
Heating, Ventilation and Air Conditioning
Mechanical and Electrical, Control and Instrumentation
Hazardous Waste
Asbestos, Waste Removal, Surveys and Remediation
Access, Lifting and Maintenance

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.