Design of: -
1. Evaluation of existing slope stability and stabilisation solutions (netting and anchors);
2. Detailed methodology for tree felling along steep incline slopes, whilst maintaining slope stability;
3. Specification of both temporary and permanent slope stabilisation solutions;
4. Specification of both temporary and permanent surface water management solutions;
5. Temporary works (platforms and roads to allow timber extraction);
6. Ecology (surveys, watching brief; potential liaison with Nature Scotland);
7. Liaison with stakeholders (DIO, MOD, FLS; Argyll & Bute Council; SEPA) as required;
8. Provide ongoing Engineering support/overview during the construction phases;
9. Provide gateway reports at end of each design and construction phases;
10. Provide detailed completion report at end of the works with any further future recommendations.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.