Survey, Design & Installation of Ship Hall

Building 1/122 Ship Hall B was built in 2003. The north elevation has a large opening
(circa 47.1 m x 32.3 m) completed by two vertical lift fabric doors, separated by a
removeable central mullion. Both doors and mullion are in a poor material condition
after 20 years, and the right-hand door (viewed from external) was damaged during a
storm in November 2024. The aim of this project is to replace the doors and associated
equipment.

The contractor shall quote for two options:
(a) A wall to close the opening.
(b) A door system to fill the opening but also allow unobstructed access into
Ship Hall B when open.
The project will be delivered in three work packages:
- Work Package 1: Surveys and RIBA 3 Design
- Work Package 2: Delivery of RIBA 4 Technical Design
- Work Package 3: Installation, Commissioning and Handover
The contractor shall develop a fully detailed and construction-ready design package that
includes technical drawings, installation methodologies, and a comprehensive compliance
plan to ensure all regulatory requirements are met. The design shall demonstrate a clear
path for commissioning, testing, and integration with other systems.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.