Skip to content

Description

Works on the Heathrow Air Traffic Control Tower. The external facade requires glazing repairs including but not limited to:

Celestial rooflights L14: Replace 3 fractured panels with like for like DGU units maintain guarding/anchors: verify interfaces at mast junction.

Level 9 VCR windows: Clean minor white deposits to frames: retain beads and units.

More details to be discussed upon engagement.

Approx programme: start Q2 2026

Note, the Design stage report attached may have additional opportunities that may be appropriate for your company.

Minimum to be part of the Common Assessment Standard Constructionline Gold, CHAS Elite etc.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.