Skip to content

Description

Works on the Heathrow Air Traffic Control Tower. The external facade requires various repairs including but not limited to

External columns L00 Prepare and coat with Intercure 99 polyaspartic DTM to match existing colour.

PPC faΓ§ade panels, louvres and external doors L00 Deep clean, abrade and apply Intercure 99 single coat DTM mask and reinstate ironmongery labels.

Vehicle barriers L00 Refix align end caps prepare and restore hazard striping and gloss system to match existing.

More details to be discussed upon engagement.

Approx programme start Q2 2026

Note, the Design stage report attached may have additional opportunities that may be appropriate for your company.

About the buyer's selection process
Minimum to be part of the Common Assessment Standard Constructionline Gold, CHAS Elite etc.

Airport experience or security clearances preferable.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions β†’ Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.