Skip to content

Description

Purpose of Notice -
The procurement of a Subcontractor for the rock catch fencing, soil nailing & shotcreting works in connection with the A417 Missing Link at Air Balloon.

Scheme Description -
Under the National Highways Limited Regional Delivery Partnership (RDP), we are appointed as the Principal Contractor for the design and construction of a new dual carriageway at the A417 Missing Link at Air Balloon.

The scheme would provide 3.4 miles (5.5km) of new, rural all-purpose dual carriageway for the A417. The new dual carriageway would connect the existing A417 Brockworth bypass with the existing dual carriageway A417 south of Cowley.

Registering Interest -
Interested parties are to register their interest through making contact via [email protected].

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.