Skip to content

Description

To undertake demolition surveys for former High Barn Farm property and agricultural shelter(s) within Section 3b on A66, in accordance with NH standards and specifications.

Requirements:
Survey to include
 Structural Assessment
o Assess structural form, condition and stability of the former
 Asbestos & Hazardous Materials Review
o Identify presence, type and condition of ACMs, and other hazardous substances, referencing existing records and noting need for intrusive follow-up surveys
 Service & Utilities Investigation
o Confirm all live, redundant, or unknown utilities (gas, electric, water, telecoms) serving the farm buildings & shelter
o Identify isolation requirements and any off-site connections

Deliverables:
A Demolition Survey Report for each asset, inc.:
 Summary of findings
 Photographic record and annotated plans
 Identified hazards & constraints
 Further survey requirements
 Inputs to support risk assessment, tendering and planning

Standards & Compliance:
All works shall comply with relevant NH standards, inc.:
 Demolition and CDM requirements
 NH asset survey requirements
 Industry best practice

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.