Skip to content

Description

Greatworth to Southam (G2S) is the most North section of the C23 section of HS2 that is managed by EKFB JV. And meets the works that BBV are doing from Birmingham to Long Itchington.

Greatworth is split into three sections

North - Southam
Central - Chipping Warden
South - Greatworth

We will be looking for a specialist contractor to seed the full section of works within G2S.

Traditional method & Hydroseeding is to be considered.


Various seeding types including General Purpose, Meadow mix, Pond Edge, Riverbank, Special & Standard Meadow Mixtures and traditional wildflower seed approx. total combined 44,000,000 grams

There are gradients on the route, embankments and cuttings.

Supply of seed mix would be by the Contractor to HS2 Specification.

Please express your interest within this package.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.