Skip to content

Description

We are seeking to appoint a suitable and experienced contractor to dismantle, move and re-assemble an existing construction marquee at Old Oak Common (OOC) HS2 railway station. Dimensions 12x24 metres. Apex height 4.96 metres.

Works under the contract are required for the end of April 2026 and contractors are required to have the relevant, quality, health and safety accreditations. E.g. Constructionline Silver or above, assessed by RISQS, ISO9001, ISO45001.

User Feedback

Important Information

Terms of Use Guidelines We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions โ†’ Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.