1. Overview
The works comprise the supply and installation of steel sheet piling to support temporary and permanent structures across the A66 NTP Project, BBA Section 3b.

2. Detailed Scope
2.1 Supply of Materials
The Contractor shall supply:
โ€ข Steel sheet piles in various profile sizes, complete with corrosion protection and cut to length requirements.
2.2 Installation of Sheet Piles
The Contractor shall undertake:
โ€ข Pile installation works including driving, vibration, pre drilling, cutting, interlock connections, tie rods, waling and bracing systems.
โ€ข Removal of sheet piles upon completion of works.
2.3 Associated Works
The Contractor shall complete associated activities including:
โ€ข Pile guide frames
โ€ข Dewatering screens
โ€ข Structural support components
2.4 Pre Construction & Site Activities
Activities include:
โ€ข Mobilisation and site establishment
โ€ข Setting out
โ€ข QA testing
โ€ข Preparation of record drawings and certification
2.5 Coordination Requirements
The Contractor shall coordinate with related project disciplines including foundations, drainage and earthworks teams.
________________________________________
3. Standards & Compliance
All works must be carried out in accordance with:
โ€ข BD 21/01
โ€ข National Highways Specification
โ€ข Relevant BS/EN/Eurocode standards
โ€ข CDM Regulations

________________________________________
4. Key Supplier Requirements
The Contractor must:
โ€ข Demonstrate capability to manage CDM and SHES risks
โ€ข Provide method statements, vibration and noise mitigation plans
โ€ข Coordinate closely with Temporary Works Designers
โ€ข Collaborate with the Balfour Beatty site and engineering teams
โ€ข Submit all required QA documentation, including testing and certification evidence
________________________________________
5. Procurement & Delivery Model (Informational Context Only)
A competitive tender process will be conducted to select a single supply and install partner for consistency, scalability and value.
(You can exclude this section if you only need the technical scope.)
________________________________________
6. Risks & Mitigation - Contractor Responsibilities
The Contractor shall support risk management in areas including:
โ€ข Early award and resource confirmation to reduce over commitment risks
โ€ข Managing vibration and settlement risks through pre condition surveys and real time monitoring
โ€ข Mitigating design or construction clashes through integrated design reviews and 3D coordination
โ€ข Minimising traffic management delays via advanced planning and flexible work slots
โ€ข Managing steel/fuel cost volatility through early procurement and index linked pricing mechanisms
________________________________________
7. Deliverables
The Contractor shall provide:
โ€ข Complete installation of specified sheet piling works
โ€ข Full QA documentation including test results and certification
โ€ข As built / record drawings

User Feedback

Important Information

Terms of Use Guidelines We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions โ†’ Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.