Skip to content

Tenders & Contracts

Find contracts your business can bid for and see what buyers need.

4,026 links

  1. HackBeanpot 2026

    About the challenge
    Step Right Up to HackBeanpot 2026!
    The greatest show on Earth is rolling into Boston! HackBeanpot 2026 is your weekend pass to a dazzling carnival of code. Whether you're a first-time hacker or a seasoned showstopper, there's room for everyone here. 
    Come for the projects and stay for the prizes, workshops, and snacks sweeter than cotton candy. Meet hackers, mentors, and new friends while spinning up solutions that matter.
    Hear from our keynote speakers: Sue Harnett, founder & CEO of Rewriting the Code, and Jessica Cao, co-founder of World37. Plus, connect with companies looking to recruit rising talent.
    So grab your ticket, bring your boldest ideas, and get ready to code, connect, and clown around.

    HackBeanpot 2026 – where tech meets fun!
    Get started
    February 13-15, 2026 @ Maven AGI
    399 Boylston St, Boston, MA 02116
    Requirements
    Please review the submission requirements here. All hacker submissions must meet requirements detailed in the document.
    Hackathon Sponsors
    Major League Hacking
    Prizes
    11 non-cash prizes Funhouse Favorite – Most creative / goofy
    1 winner This goes to the hackers who fully embraced the carnival chaos in the most whimsical, silly, and unexpected way. Whether it’s a rollercoaster of an idea, a project with an unexpected twist, or the kind of thing you’d only find at the weirdest booth at the carnival, this is your moment to let your imagination run wild and embrace the carnival spirit.
    Parade of Progress – Social impact / sustainability
    1 winner Step right up for the projects that make a real-world impact! Inspired by a clean, well-run carnival that gives more than it takes, this category celebrates projects that aim to make a positive difference in the world. Whether it’s protecting the planet, supporting communities, or encouraging better habits, this is for the hackers who build with purpose and leave the world better than they found it.
    Opening Act – Best beginner
    1 winner New hackers, welcome to the show! Your first ride at the carnival can be exciting, nerve-wracking, and full of surprises, just like your first hackathon. This award celebrates hackers who dove in headfirst, learned as they went, and created something real. It’s not about perfection; it’s about courage, growth, and sticking with the ride all the way through.
    Tightrope Tech – Most technically challenging
    1 winner For the teams who dared to walk the wire. Just like the wildest ride at the carnival, full of twists, turns, and upside-down moments, these projects tackled big problems, complex features, or numerous lines of code. Was it easy? Definitely not. But they kept their balance, navigated the loops and leaps, and pulled it off with style.
    Eye-Candy Award – Best UI/UX
    1 winner What makes a great carnival memorable? Bright lights, smooth lines, and eye-catching appeal. This prize goes to the teams whose projects are not only easy to use but also look fantastic doing it. From color choices to user flow, everything comes together seamlessly to create a naturally delightful experience.
    The Golden Ticket – Best overall
    1 winner Like scoring the golden ticket to the biggest prize at the carnival, this prize goes to the team whose project unlocks the ultimate experience. With an amazing idea, flawless execution, and lasting impact, they have earned their place at the very top, winning big and shining bright.
    [MLH] Best Use of Gemini API
    1 winner Prize: Google Swag Kits
    It's time to push the boundaries of what's possible with AI using Google Gemini. Check out the Gemini API to build AI-powered apps that make your friends say WHOA. So, what can Gemini do for your hackathon project?
    • Understand language like a human and build a chatbot that gives personalized advice
    • Analyze info like a supercomputer and create an app that summarizes complex research papers
    • Generate creative content like code, scripts, music, and more
    Think of the possibilities… what will you build with the Google Gemini API this weekend?
    Links:
    * https://mlh.link/gemini-quickstart
    [MLH] Best Use of Solana
    1 winner Prize: Ledger Nano S Plus
    The world of development is evolving fast and Solana is leading the charge with a network built to handle all of your infrastructure needs. Forget high fees and slow confirmations, it's time to build applications that are fast, efficient, and scalable.
    Harness Solana's core advantages like blazing fast execution and near-zero transaction costs to make your hackathon ideas become real world projects. With Solana, the possibilities are endless.
    • Create a game, social app, or consumer product that relies on instant, high-frequency transactions.
    • Design a sophisticated trading, lending, or decentralized exchange (DEX).
    • Build a prototype for supply chain, identity, or payments that can handle massive, real-world volume.
    Show us how you can innovate with Solana for a chance to win some cool prizes for you and each member of your team!
    Links:
    * https://mlh.link/solana
    [MLH] Best Use of ElevenLabs
    1 winner Prize: Wireless Earbuds
    Deploy natural, human-sounding audio with ElevenLabs. Create realistic, dynamic, and emotionally expressive voices for any project, from interactive AI companions to narrated stories and voice-enabled apps. ElevenLabs will empower you to build rich, immersive experiences without the need for actors or complex audio production, using simply the power of AI.
    Integrate fully autonomous audio experiences into your hack with ElevenLabs and give your project a voice, along with giving your team the chance to win some wireless earbuds!
    Links:
    * https://mlh.link/elevenlabs
    [MLH] Best Use of Snowflake API
    1 winner Prize: Arduino Tiny ML Kit
    Play with industry-leading LLMs on a single account using the Snowflake APIs. Adding AI capabilities into your application can be as simple as a single CURL command to Snowflake's REST API.
    Build customized applications, RAG powered chat bots, or embed AI-powered features into your app in half the time with half the hassle. Get started for free with a special, student 120-day Snowflake trial and check out this repository for an example of the Snowflake REST API in action.
    Links:
    * https://mlh.link/snowflake-signup
    * https://mlh.link/snowflake-tutorial
    * https://mlh.link/snowflake
    [MLH] Best Use of Auth0
    1 winner Prize: Wireless Headphones
    Auth0 wants your applications to be secure! Why spend hours building features like social sign-in, Multi-Factor Authentication, and passwordless log-in when you can enable them through Auth0 straight out of the box? You can also secure your AI applications with Auth0 for AI Agents.
    Auth0 is free to try, doesn't require a credit card, and allows for up to 7,000 free active users and unlimited log-ins. Make your new account today and use any of the Auth0 APIs for a chance to win a pair of wireless headphones for you and each member of your team!
    Links:
    * https://mlh.link/auth0-ai-agents
    * https://mlh.link/auth0-signup
    * https://mlh.link/auth0-docs
    * https://mlh.link/auth0-MLH-guides
    Devpost Achievements
    Submitting to this hackathon could earn you:
    <%= name %>
    <% if (has_levels) { %> level <%= next_level %> <% } %> Judges
    Wei He

    Ifteda Ahmed-Syed

    Jalen Wu

    Kaan Onarlioglu

    Frank Kulak

    Anika Rabenhorst

    Jenn Der

    Nirmal Jingar

    Joshua Mason

    Manish Kumar

    Dhivas Sugumar

    Jessica Cao

    Andrew Bass

    Anurag Mitra

    Judging Criteria
    Creativity
    How imaginative and unique is the project? Does it stand out from other submissions? Impact
    What social impact does the project create? Does it address a meaningful problem? Learning and Growth
    How much did the team learn and challenge themselves? Did they learn new languages, frameworks, or technical skills? Technical Difficulty
    The project must be functional for it to be considered technically difficult. How challenging are the technical problems they solve in their project (and do they do so cleanly/efficiently)? UI/UX
    How polished and visually appealing is the interface? Is it intuitive and engaging?
  2. SNS Ideathon 2026

    About the challenge: https://ideathon-2026-r49g.vercel.app/
      National-Level IDEATHON 2026
    Organized by *Dr. SNS Rajalakshmi College of Arts & Science (Autonomous)*, *Coimbatore*    Calling all UG & PG students from recognized institutions across India!  Showcase your innovative ideas and compete at the national level!    Event Dates: 25 – 27 February 2026  Venue: Dr. SNSRCAS Campus, Coimbatore    Prize Money:  Winner – ₹5 Lakhs  Runner – ₹2 Lakhs    Team Details: • Team size: 4–5 students • Maximum 2 teams per college • UG & PG students only • Inter-institutional teams not permitted    Registration Fee: ₹1000 per student (No accommodation)  Open to students from other colleges/universities (other states & districts) Get started
    Requirements
    What to Build 
    DAY 1 Preliminary Screening
    Idea Relevance & Innovation
    Objective
    Filter ideas based on relevance and originality. Ensuring the core concept aligns with the competition goals.
    Format
    Short idea pitch / abstract review
     
     
    DAY 2 Intermediate Screening
    Concept Strength & Feasibility
    Objective
    Evaluate depth and practicality of shortlisted ideas. Deep dive into the mechanics of the solution.
    Format
    Detailed concept presentation
    Duration
    10 min pitch + 5 min Q&A
    Submission
    Solution architecture, Implementation plan, Value proposition
     
     
     
     
    DAY 3 Final Screening
    Impact & Execution
    Objective
    Select winning ideas based on scalability, impact, and the quality of the prototype/demo.
    Format
    Final pitch with demo/prototype
    Duration
    15 min pitch + 10 min Q&A
    Submission
    Working Prototype / MVP + Final Deck
    Duration
    7 min pitch + 3 min Q&A
    Submission
    Problem statement + proposed solution (1 page)
    What to Submit
    Hackathon Sponsors
    Prizes
    $4 in prizes Winner - 5 Lakh
    $4 in cash 1 winner
    Devpost Achievements
    Submitting to this hackathon could earn you:
    <%= name %>
    <% if (has_levels) { %> level <%= next_level %> <% } %> Judges
    Mr. Sathappan Sethuraman
    Senior Banking Professional, Retired COO – India, Emirates NBD Bank, Trichy
    Judging Criteria
    3 rounds
    DAY 1 Preliminary Screening Idea Relevance & Innovation DAY 2 Intermediate Screening Concept Strength & Feasibility DAY 3 Final Screening Impact & Execution
  3. Contracts for Innovation in drug and alcohol addiction healthcare

    Contracts for Innovation in drug and alcohol addiction healthcare
    Organisations can apply for a share of £20 million, inclusive of VAT. Projects will advance development of pharmaceutical, digital and MedTech tools to improve treatment, recovery and prevention of harm and deaths for drug and alcohol addictions. Eligibility
    To lead a project, you can:


    be an organisation of any size, including those based in the EU, EEA or internationally work alone or with other organisations as subcontractors

    Contracts will be awarded to a single legal entity only. Opening soon
    Opens: 16 February 2026 Closes: 6 May 2026
  4. Advancing innovation in drug and alcohol addiction healthcare

    Advancing innovation in drug and alcohol addiction healthcare
    Organisations can apply for a share of £20 million across two competitions. Projects will advance development of pharmaceutical, digital and MedTech tools to improve treatment recovery and prevention of harm and deaths from drug and alcohol addictions. Eligibility
    This competition is open to collaborations only. To lead a collaborative project your organisation must be a UK registered business of any size. Opening soon
    Opens: 16 February 2026 Closes: 6 May 2026
  5. UK-Germany Collaborative Innovation for Quantum Technologies 2026

    UK-Germany Collaborative Innovation for Quantum Technologies 2026
    UK registered organisations can apply for a share of up to £3 million for innovative projects in quantum. This funding is from Innovate UK, part of UK Research and Innovation (UKRI). Eligibility
    This competition is open to collaborations only.

    To lead a collaborative project your organisation must be a UK registered business of any size.

    You must collaborate with at least one business partner based in Germany applying under the equivalent German Federal Ministry of Technology, Research and Space (BMFTR) programme.

    Open now
    Opened: 12 February 2026 Closes: 15 April 2026
  6. CA17178 - Tender 31/2025 - PEACEPLUS Thriving Together Social and Emotional Support Programmes - The Art of Connection for the Newry, Mourne and Down District Council Area.

    Description

    Competent consultancy companies are hereby invited to tender to design, develop and deliver a Social and Emotional Intergenerational Support programme, focusing on Arts & Crafts.

    To access this competition:

    Registered:
    Login to https://suppliers.multiquote.com and view the opportunity CA17178.

    Not registered:
    Visit https://suppliers.multiquote.com then register and quote CA17178 as the reason for registration.

    Any queries please contact MultiQuote on 0151 482 9230.
  7. CA17176 - Cherry Tree Academy Trust _ King's Lynn

    Description

    Cherry Tree Academy Trust is seeking a catering partner who produce excellent meals, every day, for its pupils and staff

    To access this competition:

    Registered:
    Login to https://suppliers.multiquote.com and view the opportunity CA17176.

    Not registered:
    Visit https://suppliers.multiquote.com then register and quote CA17176 as the reason for registration.

    Any queries please contact MultiQuote on 0151 482 9230.
  8. CA17175 - Polegate School _ East Sussex

    Description

    A high quality catering partner is sought to provide a fresh food service provision at Polegate School

    To access this competition:

    Registered:
    Login to https://suppliers.multiquote.com and view the opportunity CA17175.

    Not registered:
    Visit https://suppliers.multiquote.com then register and quote CA17175 as the reason for registration.

    Any queries please contact MultiQuote on 0151 482 9230.
  9. FDIS - Haverfordwest Whole House Refurbishments to 3 properties - FY2026/27 - Amey Central Region - West

    Description

    Central Region - West

    Whole House Refurbishments, scope of works likely to include:

    • Replace Kitchen & Bathroom
    • Replace Doors and Windows
    • Replace Roof
    • Replace Boiler/Heating/Plumbing
    • Electrical rewire
    • Internal reconfigurations

    Amey have been tasked by the DIO through the FDIS to deliver the Regional Accommodation Maintenance Service for the Central and North Regions.

    This notice is a call for competition and there may not be a further notice related to this opportunity.

    For Amey to accept any EoI it is ESSENTIAL that any subcontractor is:

    • willing to act as Main Contractor (essential requirement);
    • a Verified member of Constructionline (GOLD), relevant Work Category MUST show that Subcontracting is possible, and the 'Building Safety Act - Standard Construction' must be Verified;
    • capable of working to MOD SFG20 (PPM works only);
    • capable of working in a BIM Level 2 environment (where applicable);
    • compliant with DefStan 05-138 (required if you are likely to handle MoD Identifiable Information on your IT system);
    • willing to work with Amey to deliver Social Value to our Client; ideally, comp lete the Social Value Goal within the Constructionline platform.

    DESIRABLE attributes of our Supply Chain:
    • have a Corporate Social Responsibility policy;
    • have a Business Continuity and Disaster Recovery Plan

    If successful the subcontractor will need to pass a PQQ, sign up to Amey Terms and Conditions, and meet the MoD Security Requirements.

    This future opportunity notice is for Expressions of Interest, BY EMAIL ONLY.

    Procurement Documentation will follow separately via a link from our e-tender portal (Curtis Fitch).

    Note 1: The bidder must quote for all aspects of the Works.
    Note 2: Future works of a similar nature may be negotiated based upon submitted rates.
    Note 3: Those making an Expression of Interest will be required to sign-up to our 'Sub-contract Agreement' where 'Mini Competitions' or 'Call Offs' will be used to tender works/services.
    Note 4: For complex projects such as External Wall Insulation installation, Structural works etc. it is a requirement that the bidder must (at Contract Award) carry PI Insurance cover of not less than £1,000,000.
    Note 5: Those making an EoI will be assessed in accordance with the Public Contract Regulations 2015 i.e. Regulations 57, 58 & 60. ADS expressly reserves the right to require those making an EoI to provide additional information supplementing or clarifying any of the information requested.
    Note 6: Depending on Amey's annual spend with individual bidders you may be required to either have committed to the Science Based Targets Initiative (SBTi), set SBTi approved near-term targets, or Net Zero targets.

    This opportunity is also advertised on Constructionline.

    ADS does not bind itself to accept any tender and is not liable for any costs incurred by those expressing an interest or tendering for this opportunity.
  10. FDIS - Lichfield Whole House Refurbishment of 24 properties - FY2026/27 - Amey Central Region - West

    Description

    Central Region - West

    Whole House Refurbishments, scope of works likely to include:

    • Replace Kitchen & Bathroom

    • Replace Doors and Windows

    • Replace Roof

    • Replace Boiler/Heating/Plumbing

    • Electrical rewire

    • Internal reconfigurations

    Amey have been tasked by the DIO through the FDIS to deliver the Regional Accommodation Maintenance Service for the Central and North Regions.

    This notice is a call for competition and there may not be a further notice related to this opportunity.

    For Amey to accept any EoI it is ESSENTIAL that any subcontractor is:
    • willing to act as Main Contractor (essential requirement);
    • a Verified member of Constructionline (GOLD), relevant Work Category MUST show that Subcontracting is possible, and the 'Building Safety Act - Standard Construction' must be Verified;
    • capable of working to MOD SFG20 (PPM works only);
    • capable of working in a BIM Level 2 environment (where applicable);
    • compliant with DefStan 05-138 (required if you are likely to handle MoD Identifiable Information on your IT system);
    • willing to work with Amey to deliver Social Value to our Client; ideally, comp lete the Social Value Goal within the Constructionline platform.

    DESIRABLE attributes of our Supply Chain:
    • have a Corporate Social Responsibility policy;
    • have a Business Continuity and Disaster Recovery Plan

    If successful the subcontractor will need to pass a PQQ, sign up to Amey Terms and Conditions, and meet the MoD Security Requirements.

    This future opportunity notice is for Expressions of Interest, BY EMAIL ONLY.

    Procurement Documentation will follow separately via a link from our e-tender portal (Curtis Fitch).

    Note 1: The bidder must quote for all aspects of the Works.
    Note 2: Future works of a similar nature may be negotiated based upon submitted rates.
    Note 3: Those making an Expression of Interest will be required to sign-up to our 'Sub-contract Agreement' where 'Mini Competitions' or 'Call Offs' will be used to tender works/services.
    Note 4: For complex projects such as External Wall Insulation installation, Structural works etc. it is a requirement that the bidder must (at Contract Award) carry PI Insurance cover of not less than £1,000,000.
    Note 5: Those making an EoI will be assessed in accordance with the Public Contract Regulations 2015 i.e. Regulations 57, 58 & 60. ADS expressly reserves the right to require those making an EoI to provide additional information supplementing or clarifying any of the information requested.
    Note 6: Depending on Amey's annual spend with individual bidders you may be required to either have committed to the Science Based Targets Initiative (SBTi), set SBTi approved near-term targets, or Net Zero targets.

    This opportunity is also advertised on Contracts Finder.

    ADS does not bind itself to accept any tender and is not liable for any costs incurred by those expressing an interest or tendering for this opportunity.
  11. FDIS - Shawbury Whole House Refurbishment of 20 properties - FY2026/27 - Amey Central Region - West

    Description

    Central Region - West

    Whole House Refurbishments, scope of works likely to include:

    • Replace Kitchen & Bathroom

    • Replace Doors and Windows

    • Replace Roof

    • Replace Boiler/Heating/Plumbing

    • Electrical rewire

    • Internal reconfigurations

    Amey have been tasked by the DIO through the FDIS to deliver the Regional Accommodation Maintenance Service for the Central and North Regions.

    This notice is a call for competition and there may not be a further notice related to this opportunity.

    For Amey to accept any EoI it is ESSENTIAL that any subcontractor is:
    • willing to act as Main Contractor (essential requirement);
    • a Verified member of Constructionline (GOLD), relevant Work Category MUST show that Subcontracting is possible, and the 'Building Safety Act - Standard Construction' must be Verified;
    • capable of working to MOD SFG20 (PPM works only);
    • capable of working in a BIM Level 2 environment (where applicable);
    • compliant with DefStan 05-138 (required if you are likely to handle MoD Identifiable Information on your IT system);
    • willing to work with Amey to deliver Social Value to our Client; ideally, comp lete the Social Value Goal within the Constructionline platform.

    DESIRABLE attributes of our Supply Chain:
    • have a Corporate Social Responsibility policy;
    • have a Business Continuity and Disaster Recovery Plan

    If successful the subcontractor will need to pass a PQQ, sign up to Amey Terms and Conditions, and meet the MoD Security Requirements.

    This future opportunity notice is for Expressions of Interest, BY EMAIL ONLY.

    Procurement Documentation will follow separately via a link from our e-tender portal (Curtis Fitch).

    Note 1: The bidder must quote for all aspects of the Works.
    Note 2: Future works of a similar nature may be negotiated based upon submitted rates.
    Note 3: Those making an Expression of Interest will be required to sign-up to our 'Sub-contract Agreement' where 'Mini Competitions' or 'Call Offs' will be used to tender works/services.
    Note 4: For complex projects such as External Wall Insulation installation, Structural works etc. it is a requirement that the bidder must (at Contract Award) carry PI Insurance cover of not less than £1,000,000.
    Note 5: Those making an EoI will be assessed in accordance with the Public Contract Regulations 2015 i.e. Regulations 57, 58 & 60. ADS expressly reserves the right to require those making an EoI to provide additional information supplementing or clarifying any of the information requested.
    Note 6: Depending on Amey's annual spend with individual bidders you may be required to either have committed to the Science Based Targets Initiative (SBTi), set SBTi approved near-term targets, or Net Zero targets.

    This opportunity is also advertised on Contracts Finder.

    ADS does not bind itself to accept any tender and is not liable for any costs incurred by those expressing an interest or tendering for this opportunity.
  12. CA17181 - Tender 30/2025 - NMANDD PEACEPLUS "Thriving Together" - Social and Emotional Support Programmes

    Description

    Tenderers are invited to submit detailed proposals for the design, coordination, and delivery of 21 Social and Emotional Support Programmes (three per District Electoral Area - DEA) across Newry, Mourne and Down.

    To access this competition:

    Registered:
    Login to https://suppliers.multiquote.com and view the opportunity CA17181.

    Not registered:
    Visit https://suppliers.multiquote.com then register and quote CA17181 as the reason for registration.

    Any queries please contact MultiQuote on 0151 482 9230.
  13. M6 Lune Gorge - Hydrodemolition

    Description

    Kier Transportation require a Subcontractor to undertake the hydro-demolition works at Lune Gorge. Hydro-demolition required on existing structure elements (pier tops, abutment sections) across the Lune Gorge structures in Tebay. The structures are located around Junction 38 of the M6 motorway.

    We will use the Build UK Common Assessment Criteria (CAS) to ensure a consistent minimum business competence. If your company possesses necessary qualifications and is interested in bidding for this project, please email [email protected] with your company's portfolio, relevant experience, and references for further evaluation.
  14. FDIS - St Athan Whole House Refurbishments to 21 properties - FY2026/27 - Amey Central Region - West

    Description

    Central Region - West

    Whole House Refurbishments, scope of works likely to include:

    • Replace Kitchen & Bathroom
    • Replace Doors and Windows
    • Replace Roof
    • Replace Boiler/Heating/Plumbing
    • Electrical rewire
    • Internal reconfigurations

    Amey have been tasked by the DIO through the FDIS to deliver the Regional Accommodation Maintenance Service for the Central and North Regions.

    This notice is a call for competition and there may not be a further notice related to this opportunity.

    For Amey to accept any EoI it is ESSENTIAL that any subcontractor is:

    • willing to act as Main Contractor (essential requirement);
    • a Verified member of Constructionline (GOLD), relevant Work Category MUST show that Subcontracting is possible, and the 'Building Safety Act - Standard Construction' must be Verified;
    • capable of working to MOD SFG20 (PPM works only);
    • capable of working in a BIM Level 2 environment (where applicable);
    • compliant with DefStan 05-138 (required if you are likely to handle MoD Identifiable Information on your IT system);
    • willing to work with Amey to deliver Social Value to our Client; ideally, comp lete the Social Value Goal within the Constructionline platform.

    DESIRABLE attributes of our Supply Chain:
    • have a Corporate Social Responsibility policy;
    • have a Business Continuity and Disaster Recovery Plan

    If successful the subcontractor will need to pass a PQQ, sign up to Amey Terms and Conditions, and meet the MoD Security Requirements.

    This future opportunity notice is for Expressions of Interest, BY EMAIL ONLY.

    Procurement Documentation will follow separately via a link from our e-tender portal (Curtis Fitch).

    Note 1: The bidder must quote for all aspects of the Works.
    Note 2: Future works of a similar nature may be negotiated based upon submitted rates.
    Note 3: Those making an Expression of Interest will be required to sign-up to our 'Sub-contract Agreement' where 'Mini Competitions' or 'Call Offs' will be used to tender works/services.
    Note 4: For complex projects such as External Wall Insulation installation, Structural works etc. it is a requirement that the bidder must (at Contract Award) carry PI Insurance cover of not less than £1,000,000.
    Note 5: Those making an EoI will be assessed in accordance with the Public Contract Regulations 2015 i.e. Regulations 57, 58 & 60. ADS expressly reserves the right to require those making an EoI to provide additional information supplementing or clarifying any of the information requested.
    Note 6: Depending on Amey's annual spend with individual bidders you may be required to either have committed to the Science Based Targets Initiative (SBTi), set SBTi approved near-term targets, or Net Zero targets.

    This opportunity is also advertised on Constructionline.

    ADS does not bind itself to accept any tender and is not liable for any costs incurred by those expressing an interest or tendering for this opportunity.
  15. Manchester International Airport - Temporary Works Piling Enabling Works

    Description

    "The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport.

    The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP):

    A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services.

    The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions.

    The scope areas for this package are as follows:

    The piling mat location along S2 and S1 walls will need to be installed to accommodate the arrival of the SF95 CFA piling rigs. The excavation of material and installation of temporary works for the pile mats will be on 3rd party land belonging to the Clayton Hotel and MAG.

    - Clayton Hotel Wall Removal/Relocation and Reinstatement upon completion.
    - Remove Fencing
    - Piling Mat Installation (S1 134m, S2 194m)
    - Screw Piles
    - Stone up the area adjacent to the UU area (already deveged)
    - Install Railway access steps
  16. CA17173 - Extra Care Area Works - Beechlydene Ward & Ashdown Unit

    Description

    Avon and Wiltshire Mental Health Partnership wish to appoint a Contractor to complete construction works at Beechlydene Ward and Ashdown Unit at Fountain Way, Wilton Road, Salisbury Wiltshire SP2 7FD.

    To access this competition:

    Registered:
    Login to https://suppliers.multiquote.com and view the opportunity CA17173.

    Not registered:
    Visit https://suppliers.multiquote.com then register and quote CA17173 as the reason for registration.

    Any queries please contact MultiQuote on 0151 482 9230.
  17. FDIS - Wyton Whole House Refurbishments to 33 properties - FY2026/27 - Amey Central Region - East

    Description

    Central Region - East

    Whole House Refurbishments, scope of works likely to include:

    • Replace Kitchen & Bathroom
    • Replace Doors and Windows
    • Replace Roof
    • Replace Boiler/Heating/Plumbing
    • Electrical rewire
    • Internal reconfigurations

    Amey have been tasked by the DIO through the FDIS to deliver the Regional Accommodation Maintenance Service for the Central and North Regions.

    This notice is a call for competition and there may not be a further notice related to this opportunity.

    For Amey to accept any EoI it is ESSENTIAL that any subcontractor is:
    • willing to act as Main Contractor (essential requirement);
    • a Verified member of Constructionline (GOLD), relevant Work Category MUST show that Subcontracting is possible, and the 'Building Safety Act - Standard Construction' must be Verified;
    • capable of working to MOD SFG20 (PPM works only);
    • capable of working in a BIM Level 2 environment (where applicable);
    • compliant with DefStan 05-138 (required if you are likely to handle MoD Identifiable Information on your IT system);
    • willing to work with Amey to deliver Social Value to our Client; ideally, complete the Social Value Goal within the Constructionline platform.

    DESIRABLE attributes of our Supply Chain:
    • have a Corporate Social Responsibility policy;
    • have a Business Continuity and Disaster Recovery Plan

    If successful the subcontractor will need to pass a PQQ, sign up to Amey Terms and Conditions, and meet the MoD Security Requirements.

    This future opportunity notice is for Expressions of Interest, BY EMAIL ONLY.

    Procurement Documentation will follow separately via a link from our e-tender portal (Curtis Fitch).

    Note 1: The bidder must quote for all aspects of the Works.
    Note 2: Future works of a similar nature may be negotiated based upon submitted rates.
    Note 3: Those making an Expression of Interest will be required to sign-up to our 'Sub-contract Agreement' where 'Mini Competitions' or 'Call Offs' will be used to tender works/services.
    Note 4: For complex projects such as External Wall Insulation installation, Structural works etc. it is a requirement that the bidder must (at Contract Award) carry PI Insurance cover of not less than £1,000,000.
    Note 5: Those making an EoI will be assessed in accordance with the Public Contract Regulations 2015 i.e. Regulations 57, 58 & 60. ADS expressly reserves the right to require those making an EoI to provide additional information supplementing or clarifying any of the information requested.
    Note 6: Depending on Amey's annual spend with individual bidders you may be required to either have committed to the Science Based Targets Initiative (SBTi), set SBTi approved near-term targets, or Net Zero targets.

    This opportunity is also advertised on Constructionline.

    ADS does not bind itself to accept any tender and is not liable for any costs incurred by those expressing an interest or tendering for this opportunity.
  18. Marquee dismantle, move, re-erect ANTHRO-PROC-LOG8

    Description

    We are seeking to appoint a suitable and experienced contractor to dismantle, move and re-assemble an existing construction marquee at Old Oak Common (OOC) HS2 railway station. Dimensions 12x24 metres. Apex height 4.96 metres.

    Works under the contract are required for the end of April 2026 and contractors are required to have the relevant, quality, health and safety accreditations. E.g. Constructionline Silver or above, assessed by RISQS, ISO9001, ISO45001.
  19. Lower Thames Crossing - Kent Roads - Stage 1 works - Compound Kerb Install

    Description

    Skanska is seeking to procure a Subcontractor to carry out kerb installation to supporting compound access routes, and hard standings / car parks located in Gravesend, Kent. The subcontractor will be responsible for providing all labour, plant, and quality assurance necessary to complete the kerb install works in accordance with the specifications, programme requirements, and safety standards set by Skanska as the Main Contractor.

    The Lower Thames Crossing (LTC) is a new road to better connect Essex and Kent through a tunnel beneath the River Thames. Our purpose is to drive a change in how we deliver - connecting people to jobs, businesses to opportunities, leaving a skills legacy for the local community and championing biodiversity and low-carbon construction.

    To support the project ambitions, we are committed to publishing opportunities on Contracts Finder to ensure full visibility for SMEs and local subcontractors. By doing so, we widen access to the Lower Thames Crossing supply chain, encourage participation from smaller and local businesses, and help unlock regional growth. This approach ensures that organisations of all sizes can compete fairly, strengthens local economies, and maximises the benefit of investment within the communities closest to the project.

    Our ambition is to deliver the UK's greenest road, and to do the right thing for local communities and the environment. We can only achieve this with the support of our supply chain, and it is therefore critical that for any supplier to be successful in winning work on LTC, they must demonstrate commitments to supporting delivery of our ambitions:
    • Supporting LTC to leave a skills legacy for the local community. This means recruiting a local workforce and upskilling the supply chain to enable meaningful progression into higher paid, higher skilled work.
    • Delivering LTC with the lowest practicable carbon. This includes adoption of our "zero emissions" intent, eradication of diesel on site and promotion of alternative sustainable fuels.
    • Helping to create successful opportunities by providing early careers roles, such as apprenticeships, and inspiring young people into construction through delivery of STEM engagement.

    The operatives involved in the works shall be competent with relevant qualifications and competency cards (CSCS) and have a Highway Passport.
  20. Lower Thames Crossing - Kent Roads - Stage 1 works - Compound White Lining

    Description

    Skanska is seeking to procure a Subcontractor to supply, deliver, and install White Lining to supporting compound access routes, and hard standings / car parks located in Gravesend, Kent. The subcontractor will be responsible for providing all labour, materials, plant, and quality assurance necessary to complete the white lining works in accordance with the specifications, programme requirements, and safety standards set by Skanska as the Main Contractor.

    The Lower Thames Crossing (LTC) is a new road to better connect Essex and Kent through a tunnel beneath the River Thames. Our purpose is to drive a change in how we deliver - connecting people to jobs, businesses to opportunities, leaving a skills legacy for the local community and championing biodiversity and low-carbon construction.

    To support the project ambitions, we are committed to publishing opportunities on Contracts Finder to ensure full visibility for SMEs and local subcontractors. By doing so, we widen access to the Lower Thames Crossing supply chain, encourage participation from smaller and local businesses, and help unlock regional growth. This approach ensures that organisations of all sizes can compete fairly, strengthens local economies, and maximises the benefit of investment within the communities closest to the project.

    Our ambition is to deliver the UK's greenest road, and to do the right thing for local communities and the environment. We can only achieve this with the support of our supply chain, and it is therefore critical that for any supplier to be successful in winning work on LTC, they must demonstrate commitments to supporting delivery of our ambitions:
    • Supporting LTC to leave a skills legacy for the local community. This means recruiting a local workforce and upskilling the supply chain to enable meaningful progression into higher paid, higher skilled work.
    • Delivering LTC with the lowest practicable carbon. This includes adoption of our "zero emissions" intent, eradication of diesel on site and promotion of alternative sustainable fuels.
    • Helping to create successful opportunities by providing early careers roles, such as apprenticeships, and inspiring young people into construction through delivery of STEM engagement.

    The operatives involved in the works shall be competent with relevant qualifications and competency cards (CSCS) and have a Highway Passport.
  21. Lower Thames Crossing - Kent Roads - Stage 1 works - Office Compound Surfacing

    Description

    Skanska is seeking to procure a Subcontractor to supply, deliver, and install asphalt surfacing to support compound access routes, and hard standings located in Gravesend, Kent. The subcontractor will be responsible for providing all labour, materials, plant, and quality assurance necessary to complete the surfacing works in accordance with the specifications, programme requirements, and safety standards set by Skanska as the Main Contractor.

    The Lower Thames Crossing (LTC) is a new road to better connect Essex and Kent through a tunnel beneath the River Thames. Our purpose is to drive a change in how we deliver - connecting people to jobs, businesses to opportunities, leaving a skills legacy for the local community and championing biodiversity and low-carbon construction.

    To support the project ambitions, we are committed to publishing opportunities on Contracts Finder to ensure full visibility for SMEs and local subcontractors. By doing so, we widen access to the Lower Thames Crossing supply chain, encourage participation from smaller and local businesses, and help unlock regional growth. This approach ensures that organisations of all sizes can compete fairly, strengthens local economies, and maximises the benefit of investment within the communities closest to the project.

    Our ambition is to deliver the UK's greenest road, and to do the right thing for local communities and the environment. We can only achieve this with the support of our supply chain, and it is therefore critical that for any supplier to be successful in winning work on LTC, they must demonstrate commitments to supporting delivery of our ambitions:
    • Supporting LTC to leave a skills legacy for the local community. This means recruiting a local workforce and upskilling the supply chain to enable meaningful progression into higher paid, higher skilled work.
    • Delivering LTC with the lowest practicable carbon. This includes adoption of our "zero emissions" intent, eradication of diesel on site and promotion of alternative sustainable fuels.
    • Helping to create successful opportunities by providing early careers roles, such as apprenticeships, and inspiring young people into construction through delivery of STEM engagement.

    The operatives involved in the works shall be competent with relevant qualifications and competency cards (CSCS) and have a Highway Passport.
  22. GB-Campbeltown: OPA T815 OFD Campbeltown Depot EICR

    Description

    OPA T815, to carry out Electrical Installation Condition Report (EICR) at OPA Oil Fuel Depot Campbeltown
  23. FDIS - Catterick Whole House Refurbishments to 53 properties - FY2026/27 - Amey North Region - Northern England

    Description

    North Region - Northern England

    Whole House Refurbishments, scope of works likely to include:

    • Replace Kitchen & Bathroom
    • Replace Doors and Windows
    • Replace Roof
    • Replace Boiler/Heating/Plumbing
    • Electrical rewire
    • Internal reconfigurations

    Amey have been tasked by the DIO through the FDIS to deliver the Regional Accommodation Maintenance Service for the Central and North Regions.

    This notice is a call for competition and there may not be a further notice related to this opportunity.

    For Amey to accept any EoI it is ESSENTIAL that any subcontractor is:
    • willing to act as Main Contractor (essential requirement);
    • a Verified member of Constructionline (GOLD), relevant Work Category MUST show that Subcontracting is possible, and the 'Building Safety Act - Standard Construction' must be Verified;
    • capable of working to MOD SFG20 (PPM works only);
    • capable of working in a BIM Level 2 environment (where applicable);
    • compliant with DefStan 05-138 (required if you are likely to handle MoD Identifiable Information on your IT system);
    • willing to work with Amey to deliver Social Value to our Client; ideally, complete the Social Value Goal within the Constructionline platform.

    DESIRABLE attributes of our Supply Chain:
    • have a Corporate Social Responsibility policy;
    • have a Business Continuity and Disaster Recovery Plan

    If successful the subcontractor will need to pass a PQQ, sign up to Amey Terms and Conditions, and meet the MoD Security Requirements.

    This future opportunity notice is for Expressions of Interest, BY EMAIL ONLY.

    Procurement Documentation will follow separately via a link from our e-tender portal (Curtis Fitch).

    Note 1: The bidder must quote for all aspects of the Works.
    Note 2: Future works of a similar nature may be negotiated based upon submitted rates.
    Note 3: Those making an Expression of Interest will be required to sign-up to our 'Sub-contract Agreement' where 'Mini Competitions' or 'Call Offs' will be used to tender works/services.
    Note 4: For complex projects such as External Wall Insulation installation, Structural works etc. it is a requirement that the bidder must (at Contract Award) carry PI Insurance cover of not less than £1,000,000.
    Note 5: Those making an EoI will be assessed in accordance with the Public Contract Regulations 2015 i.e. Regulations 57, 58 & 60. ADS expressly reserves the right to require those making an EoI to provide additional information supplementing or clarifying any of the information requested.
    Note 6: Depending on Amey's annual spend with individual bidders you may be required to either have committed to the Science Based Targets Initiative (SBTi), set SBTi approved near-term targets, or Net Zero targets.

    This opportunity is also advertised on Constructionline.

    ADS does not bind itself to accept any tender and is not liable for any costs incurred by those expressing an interest or tendering for this opportunity.
  24. FDIS - Wattisham Whole House Refurbishments to 50 properties - FY2026/27 - Amey Central Region - East

    Description

    Central Region - East

    Whole House Refurbishments, scope of works likely to include:

    • Replace Kitchen & Bathroom
    • Replace Doors and Windows
    • Replace Roof
    • Replace Boiler/Heating/Plumbing
    • Electrical rewire
    • Internal reconfigurations

    Amey have been tasked by the DIO through the FDIS to deliver the Regional Accommodation Maintenance Service for the Central and North Regions.

    This notice is a call for competition and there may not be a further notice related to this opportunity.

    For Amey to accept any EoI it is ESSENTIAL that any subcontractor is:
    • willing to act as Main Contractor (essential requirement);
    • a Verified member of Constructionline (GOLD), relevant Work Category MUST show that Subcontracting is possible, and the 'Building Safety Act - Standard Construction' must be Verified;
    • capable of working to MOD SFG20 (PPM works only);
    • capable of working in a BIM Level 2 environment (where applicable);
    • compliant with DefStan 05-138 (required if you are likely to handle MoD Identifiable Information on your IT system);
    • willing to work with Amey to deliver Social Value to our Client; ideally, complete the Social Value Goal within the Constructionline platform.

    DESIRABLE attributes of our Supply Chain:
    • have a Corporate Social Responsibility policy;
    • have a Business Continuity and Disaster Recovery Plan

    If successful the subcontractor will need to pass a PQQ, sign up to Amey Terms and Conditions, and meet the MoD Security Requirements.

    This future opportunity notice is for Expressions of Interest, BY EMAIL ONLY.

    Procurement Documentation will follow separately via a link from our e-tender portal (Curtis Fitch).

    Note 1: The bidder must quote for all aspects of the Works.
    Note 2: Future works of a similar nature may be negotiated based upon submitted rates.
    Note 3: Those making an Expression of Interest will be required to sign-up to our 'Sub-contract Agreement' where 'Mini Competitions' or 'Call Offs' will be used to tender works/services.
    Note 4: For complex projects such as External Wall Insulation installation, Structural works etc. it is a requirement that the bidder must (at Contract Award) carry PI Insurance cover of not less than £1,000,000.
    Note 5: Those making an EoI will be assessed in accordance with the Public Contract Regulations 2015 i.e. Regulations 57, 58 & 60. ADS expressly reserves the right to require those making an EoI to provide additional information supplementing or clarifying any of the information requested.
    Note 6: Depending on Amey's annual spend with individual bidders you may be required to either have committed to the Science Based Targets Initiative (SBTi), set SBTi approved near-term targets, or Net Zero targets.

    This opportunity is also advertised on Constructionline.

    ADS does not bind itself to accept any tender and is not liable for any costs incurred by those expressing an interest or tendering for this opportunity.
  25. M6 Lune Gorge - Central Reserve Retaining Wall - Tebay, Jeffery's & Borrowbeck Structures

    Description

    Kier Transportation require a Subcontractor to undertake the M6 Lune Gorge - Central Reserve Retaining Wall - Tebay, Jeffery's & Borrowbeck Structures works at Lune Gorge.

    Combi- Wall (Tubular/Sheet piles) box structure to be installed in the Central Reserve immediately behind the existing bridge abutments to retain the adjacent Motorway carriageway during abutment replacement work.

    We will use the Build UK Common Assessment Criteria (CAS) to ensure a consistent minimum business competence. If your company possesses necessary qualifications and is interested in bidding for this project, please email [email protected] with your company's portfolio, relevant experience, and references for further evaluation.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.