Description
BBV are required to alter the position of the hydraulic ramp for their Wolseley Drive re-alignment scope. The Suppliers scope involves the following: -
The disconnection of all mechanical and electrical equipment
The removal of the existing unit
The installation of the existing unit
The connection of all mechanical and electrical equipment
BBV will assist with the works via: -
The excavation of the ground to create the new pit
Any in-situ concrete works
Any backfill works
Management of stakeholders
The supplier is also to consider the potential for a new hydraulic ramp system to be designed and installed and offer their ability and express their willingness to do so.
Recommended Comments
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.